WEIWEISTORE 26 Ft Retractable Dog Leash, 8m Retractable Leash for Medium Larger Dogs Up to 110 Lbs, 1 Button Break & Lock, 360 Tangle-Free, Heavy Duty Long Dog Lead for Training Running Walking 8 m Dog Cord Leash

WEIWEISTORE 26 Ft Retractable Dog Leash, 8m Retractable Leash for Medium Larger Dogs Up to 110 Lbs, 1 Button Break & Lock, 360 Tangle-Free, Heavy Duty Long Dog Lead for Training Running Walking 8 m Dog Cord Leash (Blue)

Share

WEIWEISTORE 26 Ft Retractable Dog Leash, 8m Retractable Leash for Medium Larger Dogs Up to 110 Lbs, 1 Button Break & Lock, 360 Tangle-Free, Heavy Duty Long Dog Lead for Training Running Walking 8 m Dog Cord Leash  (Blue)

R 890.00
R 592.11
33% off
i
Available online only
Select how to get this product
2157, Sandton
Change >
Delivery by
23 Aug
Easy 14-Day Return/Exchange Policy
Easy 14-Day Return/Exchange Policy
Free delivery for orders over R650, and R70 for orders under R650
Product Information
  • Colour: Blue
  • Material: Plastic
  • Pet Leash Chain Type: Cord
  • Pet Type: Dog
  • Retractable
Seller Image
Sold By
WEIWEISTORE
Product Details
In The Box
Sales Package
  • 1 CHAIN
General
Brand
  • WEIWEISTORE
Model Number
  • 26 Ft Retractable Dog Leash, 8m Retractable Leash for Medium Larger Dogs Up to 110 Lbs, 1 Button Break & Lock, 360 Tangle-Free, Heavy Duty Long Dog Lead for Training Running Walking
Brand Colour
  • blue
Pet Leash Chain Type
  • Cord
Colour
  • Blue
Pet Type
  • Dog
Material
  • Plastic
Multiple Leash
  • No
Retractable
  • Yes
Pack of
  • 1
Packaging Type
  • Box
Dimensions
Length
  • 8 m
Weight
  • 0.47 kg
Safe and Secure Payments.Easy returns.100% Authentic products.
Back to top